Environmental Program
Graphite One is conducting and planning to conduct a number of baseline studies to examine the potential impact of the Project on the environment and on land and water use by Alaska Native communities. These studies and their status are summarized in Table 1-5.
Table 4: Graphite One baseline environment studies and current execution status
Baseline Environmental Study | Status |
---|---|
Hydrology and Water Quality | Sampling of streams on Graphite Creek Property- 2014, 2015, 2016 Additional studies planned |
Wetlands | Desktop completed. Additional studies planned |
Aquatic Life and Fisheries | Initial desktop and field surveys completed in 2014. Anadromous species in Cobblestone River. No fish species documented in Graphite Creek, Ptarmigan Creek, Ruby Creek, Trail Creek. Additional aquatic life and fisheries studies planned |
Metal Leaching and Acid Base Accounting | Acid leach studies of different rock types and mineralogies - Planned |
Archeology | Planned |
Hydrogeology | Planned |
Meteorology, Air Quality | Planned |
Noise and Visual Impacts | Planned |
Wildlife | Planned |
Graphite One Resources conducts mineral exploration under the State of Alaska Annual Hardrock Exploration (AHEA) Permit. The AHEA covers drilling activities, water usage, temporary camps and small land disturbances. In addition, GPH participates in the BLM and State reclamation bonding pools. Many state and federal permits will be required to conduct mining operations at the Property. A full list will not be determined until after a Feasibility Study has been conducted and a Plan of Operations has been developed. Absent that plan, Graphite One has provisionally identified ten federal and twenty-four state permits/certificates that could be required to undertake mining on the Graphite Creek Property.